Active work log — code-inheritv2-www

Per global CLAUDE.md §7 (parallel sessions discipline). Each Claude Code CLI session working in this repo claims an area before starting + removes its entry when done.

Format

- [area] description (started YYYY-MM-DD HH:MM, owner: <session-id-or-window>)

Use git worktrees for file-level isolation when areas overlap.

Active

(none — sessions in progress should add entries here)

Recently completed (last 7 days)

  • 2026-04-28 Session 1 hardening pass — legal + tooling foundation (LICENSE + NOTICE + THIRD-PARTY-DEPENDENCIES + README + package.json + astro.config.ts + tsconfig.json + .gitignore + .editorconfig + .prettierrc + .github/workflows/{license-audit, ci}). Pushed to origin/main; arch-state v2.98.
  • 2026-04-28 Session 2 hardening pass — docs + scaffolding + BUILD-PLAN.md v1.1 (src/ skeleton + content.config.ts + 12 stub READMEs + docs/ci-pipeline.md + examples/sdk-reference-stub/ + BUILD-PLAN.md v1.0 → v1.1 with §1.4 + §3.0 + §3.4 + §3.5 + §3.6). Pushed to origin/main; arch-state v2.99.
  • 2026-04-28 Doc-reconciliation pass (post-Session-2 /review-plan) — fixed CSS naming drift (inheritv2-www-design-system.cssopeninherit-www-design-system.css in 4 places) + arch-state version pin drift in README.md (v2.97+ → v2.99+) + BUILD-PLAN.md §3.4.1 deliverable count off-by-one + added §3.0 orientation note + §3.5 effort-estimate buffer + §3.6 most-likely future lock + §6 R-021 Cloudflare mitigation + inline robots.txt block in ci-pipeline.md + scaffolded src/content/docs/integrations/ stub + created project-level CLAUDE.md + created this file.

Notes

  • Phase-1 substrate work begins at Sprint 1 (M1-M3 calendar) per BUILD-PLAN.md v1.2+ §3.4.1.
  • Active sessions running in parallel should subscribe to ntfy topic davieshq2026 for cross-session visibility.