Session date: 2026-04-24 (morning + afternoon) Final commit: to be updated after next commit lands; currently d053bdf State file version: v2.7 Registry version: v2.7 Duration: ~8 hours wall-clock

Tensions closed (8 full + 1 partial)

  1. Q4 9th-module Credentials (parent A 88.6% + 4 SDs). A-41..A-45. Module count 8→9. Registry v1.15→v2.0.
  2. T-NEW-02 Companion-estates (E Hybrid 90.2% + 4 SDs). A-46..A-49. Cross-module primitives 9→10 (Household). Registry v2.0→v2.1.
  3. T-NEW-CL-05 SHACL authoring discipline (H 96.6% + SD1 3-split). A-50..A-52. A-21 CI 7→10 gates. Registry v2.1→v2.2.
  4. T-NEW-CL-06 Public-policy contracts (J 94.4% + SD1 4-split). A-53..A-56. A-52 CI 10→12 gates. Registry v2.2→v2.3.
  5. T-NEW-CL-02 LegislativeVersion/TemporalRule (A 93.2% + 4 SDs). A-57..A-61. Cross-module primitives 10→11 (TemporalRule). Registry v2.3→v2.4.
  6. T-003 A-22 sparingly target list (D 95.4% + SD1 2-split). A-62..A-63. A-21 CI 12→13 gates. Registry v2.4→v2.5.
  7. T-OMN-001 CI/boundary-migration protocol (A 96.8% + SD1 2-split). A-64..A-65. A-21 CI 13→14 gates. Registry v2.5→v2.6.
  8. T-023 OWL+SHACL profile declaration (A 96.6% + SD1 3-split-with-CI). A-66..A-68. A-21 CI 14→16 gates. Registry v2.6→v2.7.
  9. T-NEW-CL-01 Tradition-Right bridge — parent D 84.4% + SD1 α 97.2% locked; SD2-4 pending.

Session totals

  • Amendments: A-41..A-68 (28 new)
  • Scorecards committed: 31
  • State file bumps: 7 (v1.0 → v2.7)
  • A-21 CI extensions: 6 (7 gates → 16 gates)
  • SKOS classifier schemes added: 4 (HouseholdRegime / Maturity / LegislativeStatus / CitationType)
  • Cross-module primitives added: 3 (Household #10; DataSubjectConsentRecord #9; TemporalRule #11)
  • Module count: 8 → 9 (Credentials added at Seq G1 position 2)
  • Phase 1.5 cells: 168 → 189 (21 extensions × 9 modules)
  • Auto-deep-dive wins: 5 (intro-rule / A-23-first / three-category / A-23-second / ROBOT-materialisation)
  • Weak-criteria admissions: 4 (registry-bump / A-number-economy / v6.6-fidelity / v6.6-migration)
  • New memories: 3 (feedback_auto_deep_dive_via_framework_rediscovery + feedback_weak_criteria_to_avoid_in_scorecards + this session-close summary)

Capability scorecard deltas

  • v1: 7.1 → 7.1 (stable)
  • v2: 5.6 → 7.2 (+1.6)
  • InheritKit: 3.5 → 4.0 (+0.5)
  • NEW v2+IK combined: ~7.4 (first-time calculation; edges v1 at 7.1)

Capability-lift framework authored

Post-session Rich-requested framework at docs/superpowers/specs/2026-04-24-v2-ik-combined-lift-framework.md v1.0:

  • 13 low-combined-score capabilities mapped to library + v1 + web sources
  • 6 meta-lifts identified
  • Tiers 1-4 execution sequence
  • Estimated +29 points lift → target combined ~8.3
  • Handoff prompt authored at docs/superpowers/plans/2026-04-24-v2-ik-lift-session-handoff-prompt.md

Methodological patterns confirmed (now codified as memories)

  1. Auto-deep-dive via framework-rediscovery (feedback_auto_deep_dive_via_framework_rediscovery.md)
  2. Weak-criteria avoidance (feedback_weak_criteria_to_avoid_in_scorecards.md)
  3. Amendment granularity atomic-per-natural-count (session precedent: Q4 5-split, T-NEW-02 4-split, T-NEW-CL-05 3-split, T-NEW-CL-06 4-split, T-NEW-CL-02 5-split, T-003 2-split, T-OMN-001 2-split, T-023 3-split)
  4. CI-extension-as-separate-amendment (4 precedents: A-52, A-56, A-63, A-65, A-67, A-68)

Remaining Phase 5 queue

  • T-NEW-CL-01 SD2-4 close (in-progress)
  • T-NEW-CL-03 Delegation full scope
  • T-NEW-CL-04 Pass-outside-estate
  • T-NEW-01 Executed-state (Phase A Tier-1 target)
  • T-NEW-03 AI-provenance
  • T-NEW-04 HeirDesignation basis
  • T-NEW-06 AdjudicatingAuthority
  • T-014 SDK coverage (Phase A Tier-1 target)
  • Wave 3 residuals: T-023 ✅ done; T-004, T-006, T-007 remain
  • Wave 4 alignment matrix batch
  • Wave 5 residuals: T-OMN-001 ✅ done; T-001 remains
  • Wave 6 housekeeping batch
  • Phase 6 revised plan output

Handoff to fresh session

Paste-ready prompt: docs/superpowers/plans/2026-04-24-v2-ik-lift-session-handoff-prompt.md (contains full resumption instructions + 5-phase execution sequence + standing disciplines).

First next-session action: frame new T-NEW tension for error-handling framework (combined 3 → 8, +5pp).