Wave D LP v1.8 → v2.0 — Model C restructure LIVE (commit 790f0a0)

Context

Coordinator v2 session (post-Phase-α-100% + Phase-β.1-β.2-complete) executed §6.1 first-recommended-action from 2026-05-26-coordinator-session-v2-initiation-prompt-model-c.md v1.0 (commit 13d88b2): restructure Wave D LP v1.8 → v2.0 under Model C SOTA Claude + Linear architecture.

What landed

  • 324 insertions, 84 deletions; v1.8 (254 lines) → v2.0 (494 lines)
  • All 17 audit-finding surgical edits from pre-staged memory project_wave_d_lp_v1_8_audit_findings_2026_05_26.md applied (7 HIGH + 4 MED + 4 LOW + 3 gaps)
  • 2 NEW SOTA pattern sections introduced (§3.5 + §3.6) — first Model-C-native wave launch-prompt

HIGH fixes (7)

FindingBeforeAfter
WD-RP-H1”601-doc""611-doc” + dispatch-time recompute via §0a find ... | wc -l
WD-RP-H2master_plan pin v1.12v1.15 (current floor post-Wave-C.1)
WD-RP-H3wave_c_launch_prompt pin v1.8v1.9 (current post-#198)
WD-RP-H4pin-drift LoC ~10141098 (current; +84 since S3 spike 2026-05-25)
WD-RP-H5Wave A.1 CI changelog Wave-E queue entryREMOVED (RESOLVED by Wave C.1 Del 3 Linear-aligned audit migration)
WD-RP-H6§1 step 4 CF dashboard work”PRE-PROVISIONED at b876b622-e401-49aa-be99-06deaad4af80” + CF state table
WD-RP-H7”frontmatter v1.5""v1.7” throughout (post-Wave-C.1 cascade at 560c7cc adds OPTIONAL linear_project_id field)

NEW Model C pattern sections

  • §0a Pre-flight verification battery — HALT-on-FAIL with Wave C/C.1 closure + Linear MCP + CF MCP + Wave D Project exists + 4 Issues + corpus count (611 ± 10 tolerance) + pin-drift LoC + floor pins.
  • §3.5 Spec/Plan/Tasks split per Linear Issue — issue-size scope-gate decision tree per TT-NN; /speckit-* slash commands; triplet location docs/superpowers/specs/<feature-slug>/. Recommended for TT-13 (Medium) + TT-16 (Large if promoted); skipped for TT-14 (Trivial) + TT-15 (Small).
  • §3.6 Native Claude Tasks discipline — TaskCreate per Linear Issue + per tasks.md T-item; [TT-NN T0NN] naming convention; cross-reference pattern; pre-decided forks per coordinator directive §4.

frontmatter additions

  • linear_project_id: "5627ed2c-aa55-4fc8-82d5-03cd8a385f7e" ON THE LP ITSELF (first launch-prompt to carry it; promotes to REQUIRED on wave-execution-records going forward per coordinator directive §6.1)
  • companion_files: expanded from 7 to 13 entries (added: wave_c_1_launch_prompt + wave_c_1_execution_record + cf_pages_memory + linear_aligned_audit_memory + tt_linear_setup_memory + coordinator_session_v2_directive + phase_1_5_master_plan; updated pins on existing)
  • tags expanded: model-c, linear-integration, spec-plan-tasks-split, native-claude-tasks
  • description rewritten to reflect Model C state + 611-doc baseline + Wave C.1 closure

Dispatch readiness

Wave D ready to dispatch via 3 paths per §8 (coordinator directive §6.2):

PathMechanismPilot of
(a) Linear AgentLinear → TT-13 → @Linear delegate → spawns Claude Code sessionSOTA dogfood; mobile-friendly
(b) Claude Code paste-promptPaste §8 Path (b) prompt into fresh session at ~/testatetech/Traditional; battle-tested
(c) HybridManual dispatch + Linear Issue cross-references throughout commits/PRsMiddle ground

Velocity note

This session: ~25 min coordinator authoring (substantially under the directive’s “30-45 min” estimate at §6.1, validating Wave A=10× / B=2-3× / C=2-3× / C.1=5-7× velocity-convergence trend continues for coordinator-side substrate work). No surprises; verify-before-author 6-method toolkit (multi-grep + LoC count + version-pin grep + spec count + Linear MCP status) all PASS pre-authoring. Spec count drift caught in-flight: 609 (audit memory snapshot) → 611 (v2.0 author time) — folded into v2.0 with “tolerance ±10 at dispatch” framing.

Pre-commit hook trace

  • 1st commit attempt: prettier auto-reformat blocked at the pre-commit stage (expected per established fork pattern)
  • 2nd commit attempt: prettier-reformatted file re-staged; all 11 hooks PASS (frontmatter pin-drift + lock-cascade + Conftest+Rego + prettier + hardcoded secrets) — landed at 790f0a0
  • Verify-before-completion: git log --oneline origin/main -1 matches local HEAD 790f0a0

Next actions (per coordinator directive §6)

  • §6.2 dispatch — Rich chooses Path (a)/(b)/(c) for Wave D execution
  • §6.3 Phase γ retrospective — when Wave D closes, author feedback_model_c_linear_pilot_lessons_2026_05_26.md
  • §6.4 Phase δ scaling — Phase-1.5+ master plan v1.3 → v1.4 restructure Waves F-I under Model C

Cross-references

  • Coordinator session v2 directive: docs/superpowers/specs/2026-05-26-coordinator-session-v2-initiation-prompt-model-c.md v1.0 (commit 13d88b2)
  • Wave D LP v2.0: docs/superpowers/specs/2026-05-25-wave-d-execution-launch-prompt.md (commit 790f0a0)
  • Pre-staged audit findings: ~/.claude/projects/-home-richardd-testatetech/memory/project_wave_d_lp_v1_8_audit_findings_2026_05_26.md
  • Linear Project: https://linear.app/mediahq2/project/wave-d-stage-10-mkdocs-cloudflare-pages-41be8be23f3e (ID 5627ed2c-aa55-4fc8-82d5-03cd8a385f7e)
  • Linear Issues: TT-13 + TT-14 + TT-15 + TT-16
  • CF Pages: https://tt-inherit-docs.pages.dev (ID b876b622-e401-49aa-be99-06deaad4af80)
  • TaskList: #219 completed (Wave D LP v1.8 → v2.0 Model C restructure); #196 in-flight (Wave D execution; subject updated to reflect 611-doc + Linear refs)