⚠️ PRE-REFINED-PROMPT-archived 2026-05-01T20:45 BST per Full Phase-2-3 Reversion — this memory file records a lock that has been DISCARDED. The Q is queued for re-ask under refined-prompt v3.0 discipline. Original lock content preserved below for forensic continuity. Do not act on this memory’s recommendations as if locked. Audit-record:
~/testatetech/docs-strategy/docs/superpowers/specs/2026-04-29-multi-phase-audit/audit-records/2026-05-01-full-phase-2-3-re-ask-under-refined-prompt.mdv1.0. Refined-prompt v3.0 reference:~/testatetech/docs-strategy/docs/superpowers/specs/2026-04-29-multi-phase-audit/refined-end-of-turn-directive.md.
ζ-Q1 LOCKED — Option C 14-criterion frame Thursday 30 April 2026 evening
§1 Outcome
Rich-locked Option C re-derived 14-criterion frame from primary sources, 2026-04-30T18:50 BST. Convergent decision (Claude recommendation was also C; both arrived at C from independent reasoning paths). 1.55 weighted-sum margin to F (decisively rejected per Bass §14.2 critique-by-name of ISO 25010 wholesale); 0.74 margin to G (TT-product-derived; honest fallback strengthened by Bass §14.2 “Iowability” precedent). 10/10 sensitivity perturbations preserve C.
§2 The 14 locked criteria
- Functional Suitability [ISO 25010:2023 + Jackson] — completeness + correctness + appropriateness
- Reliability/Faultlessness [ISO 25010:2023 sub-char rename]
- Safety [NEW ISO 25010:2023 9th characteristic 2023] — operational constraint + fail-safe + hazard warning + safe integration
- Formal-verification provability [T80 split] — SymCC + Lean spec + cvc5 SMT + Catala typing
- Temporal precision — datetime-precise + bi-temporal + 80-year replay
- Maintainability [ISO 25010:2023]
- Operational Excellence [AWS WAF 2025] — two-person-operability + automated CI gates
- Cost Optimization [AWS WAF 2025] — runway-discipline binding
- Compatibility [ISO 25010:2023]
- Conformance-test-suite presence [T63] — Bowtie + AAIF + per-engine harness
- Standards-track positioning [T41 split + OASIS] — PAS-route + IPR-mode + per-body-cost + standards-influence
- AI-vendor procurement attestability [T80 + A-122 + 2025 SOTA] — TRiSM + AgentArcEval + CSS + TUE
- Tooling ecosystem maturity [T81 lesson — empirical-verified]
- Acquirer-narrative strength [v1.9 #16 reframed]
§3 What was excluded under ζ.2
5 v1.9 criteria dropped:
- v1.9 #6 Developer-joy [Jackson engineering-internal — folded into Maintainability]
- v1.9 #13 100yr horizon [temporally mismatched]
- v1.9 #14 Talent-pool [engineering-internal — folded into Operational Excellence]
- v1.9 #15 LLM-moat [v1.2 no-fine-tune constraint inverts]
- #4 Continuity-with-v1.9 [NEW exclusion under ζ.2 — explicitly does not anchor on G+]
§4 Cascade artefacts (committed)
- arch-state Tier-1 v3.10 → v3.11 with A-126 amendment (commit
03990e9) - ζ-Q1 cascade file moved current-questions/ → answered-questions/ (commit
03990e9) - 2026-04-18 architecture-options scorecard v1.9 → v2.0 status: superseded (commit
03990e9) - Utility tree v1.0 authored:
Q-001-zeta-criteria-frame-locked-utility-tree.md(commit03990e9) - INDEX v2.1 → v2.2 (commit
03990e9) - Stage-1 §K answer commit
901a6f5
§5 Library work (NOT in git per filing-system discipline)
- Bass-Clements-Kazman 4e ingested at
~/off-github/library/indexed/bass-software-architecture-4e/(PDF + extracted text + TOC + metadata + notes with 15 ULID-cited verbatim quotes + exclusion-log) - T82 architecture-evaluation methodology synthesis at
~/off-github/library/projects/inherit/T82-architecture-evaluation-methodology-2026-04-30.mdv1.0 (12 sections; 14 primary sources) - Project CLAUDE.md T-file quick-reference updated to include T82 (commit
9cd1931)
§6 Research findings for ζ-Q2 option-set
5 carry-forward + 1 NEW honest 6th-option candidate:
- Option B — JSON Schema family (current direction; baseline)
- Option C — Semantic Web purist (RDF + OWL 2 DL + SHACL + SPARQL)
- Option D — Pragmatic hybrid (KG-canonical, LLM-assists)
- Option F — Catala-heavy maximalist
- Option G+ — Commercial-Catala (current canonical lock candidate)
- Option I [NEW] — Graph-RAG-Native ontology-driven hierarchical-temporal (arxiv:2505.00039 May 2025; 70% pass-rate vs RAG baseline 37.5% on Indian legal-norms case study; matches T13/T37/T44 LinkML direction + Bass §19.4 utility-tree pattern)
Option E remains INVALIDATED (TT-fine-tune cost prohibitive per feedback_no_tt_training_data_for_inherit).
Rejected as 6th-option candidates (honest discipline):
- Lean 4 native architecture — too pioneer-territory; no legal-domain precedent (Harmonic AI $100M + Mathlib 210K theorems but no legal applications)
- Smart legal contracts — regulatory gap (no state recognises blockchain wills); not viable as canonical architecture
- WASM 3.0 (Sept 2025) — deployment substrate not paradigm; relevant as Catala compile target but doesn’t constitute distinct option
§7 Next session work
Stage-3 utility tree v1.0 → v1.1: full ASR scenarios (2-3 per criterion) + fitness functions for criteria 2 + 4-14 (12 criteria). ~5-7 hours inline OR 10-12 hours subagent. Required before ζ-Q2 per-option SCORING begins.
Stage-4 ζ-Q2 cascade: 6 options (B/C/D/F/G+/I) scored against locked utility tree’s leaf scenarios under MCDA SOTA sensitivity discipline (COMSAM multi-criterion simultaneous perturbation + weight stability intervals + 8-mode PySensMCDA-style analysis per ζ-Q1 §I).
§8 Methodological observations
- Convergent decision (Rich + Claude both arrived at C from independent reasoning paths). Suggests methodology pivot’s discipline is working — when fresh evidence is engaged + presented honestly + sensitivity-tested, Rich + Claude tend to converge.
- Bass acquisition was decisively right. Single-book purchase (~£50-70 + 3 hours indexing+notes) closed the most consequential library-coverage gap. Recommendation strength rose from Claude-synthesised to SEI-canonical-anchored. Compare to alternative (5-book set ~£525-660 + multi-week wait).
- First A-numbered amendment (A-126) under ζ.2 methodology registered cleanly through pin-drift hook + Stage-1/Stage-2 separation discipline. Methodology pivot validated through actual cascade execution.
- ζ-Q1 took 4 hours wall-clock from MQ-000 lock to ζ-Q1 lock (16:30 → 18:50 BST + research/cascade through 19:30). Includes Bass acquisition + indexing + T82 synthesis + 4 web searches. Pace is realistic for ζ-Q2..ζ-Q10 if Rich-availability is consistent.
- Utility tree v1.0 with 2/14 fully built is sufficient for ζ-Q2 SCOPING work but not for full per-option SCORING. v1.1 expansion is the gating task for ζ-Q2 to begin.
§9 Cross-references
- Locked answer:
docs/superpowers/specs/2026-04-29-multi-phase-audit/answered-questions/Q-001-zeta-criteria-frame-for-broader-options.mdv1.1 - Utility tree:
docs/superpowers/specs/2026-04-29-multi-phase-audit/Q-001-zeta-criteria-frame-locked-utility-tree.mdv1.0 - arch-state amendment:
docs/superpowers/specs/inherit-v2-architecture-state.mdv3.11 A-126 - T82 methodology:
~/off-github/library/projects/inherit/T82-architecture-evaluation-methodology-2026-04-30.mdv1.0 - Bass per-book:
~/off-github/library/indexed/bass-software-architecture-4e/ - Design spec:
docs/superpowers/specs/2026-04-30-architecture-rederivation-design.mdv1.1 - MQ-000:
docs/superpowers/specs/2026-04-29-multi-phase-audit/meta-questions/MQ-000-prior-work-revisit-scope.mdv1.0